Amortization Method
Previous Top Next

 
The page is used to set a Amortization method at the account level and setup for usage at the group level.

The topmost section of the page covers the setup and values of the Account Level Amortization Method.  Here, the effective date creates a time-based schedule for the default amortization method. The Grant Date of each grant determines its default amortization method.

To Add an Amortization Method:
1.  Enter an Effective Date. The default value is the current date. Once an effective date is set with an amortization method, another amortization method cannot be set for the same effective date until the existing one is deleted.

2.  Select an Amortization Method.  Only one Amortization Method can be selected per date.  None is the default: however a value other than none must be selected in order to add an amortization method.

3.  Click the Add Row button to provide a schedule longer than two entries. 

4.   Click on Save to save the changes.

To Delete an Amortization Method:
-   Click the Delete link located to the right of the Amortization Method column.


Setting up for Group-level usage of Amortization Method

1. To setup a new Schedule Code, type in a 5-digit alpha, numeric or alpha-numeric value in the input box.
2. Alongside in the Schedule Name, enter a descriptive name to be associated with the Schedule Code.
3. To the right of the Schedule Name are two options:
            i. Delete, which deletes the Schedule Code and Schedule Name
            ii. View Amortization Schedule Line, which activates the Amortization Method             Schedule Lines below.
4. Enter Effective Date and Amortization Method values in the Amortization Method Schedule Lines. To add more Effective Dates, click on the Add Row button. Clicking on Save saves the values and associates the values to the Schedule Code above. Cancel clears any changes.

Assigning Group-level Values
Assignment of values is performed under the section Amortization Method Schedule Assignment. Schedules can be assigned at the following levels:
·    Grant Type
·    Plan Name
·    Award Type
·    Award Subtype
·    User-defined values

Select the Amortization Method Schedule for the group value you want it assigned at, and click on Save to save changes, or Cancel to clear changes.