Effective Date Schedule File
|
Previous Top Next |
If there is more than one record in the Effective Date Schedule file with the same Grant ID, Tranche ID and Effective Date the system will assume that the last record is supposed to update the previous record(s). The previous record(s) will be lost and no validation error will be reported.
|
Field Name
P =Required
|
Field Type
|
Sample Field
|
Description
| |
1
|
GrantID
|
P
|
Alpha-Numeric (40)
|
1554
|
Links to Grant information
|
2
|
TrancheID
|
P
|
Alpha-Numeric(20)
|
0001
|
The identifier of the Tranche within
the Grant
|
3
|
Effective Date
|
P
|
Date
|
01/06/2011
|
The Effective Date of all non-blank
values provided in this file.
|
4
|
Instruments
Multiplier
|
|
Numeric (14,4)
Note: enter as decimal
not %(1.25 not 125%)
|
1.25
|
A percentage applied to Base
Instruments Granted (Shares
Granted) to determine the quantity
of target shares to be earned.
Decimal value.
.
|
5
|
EPS Market
Multiplier
|
|
Numeric (14,4)
|
1.15
|
A percentage applied to the Base
Instruments Granted for purposes of
computing EPS Shares Outstanding
(EPS SO) when award has a market
condition. Decimal value.
.
|
6
|
EPS
Performance
Multiplier
|
|
Numeric (14,4)
|
1.20
|
A percentage applied to the Base
Instruments Granted for purposes of
computing EPS Shares Outstanding
|
7
|
Fair Value
|
|
Numeric(14,4)
|
6.85
|
The Fair Value of a Share at the
Effective Date
|
8
|
Exercise Price
|
|
Numeric(14,4)
|
5.0
|
The Exercise Price at the Effective
Date
|
9
|
Service Period
End Date
|
|
Date
|
04/25/2014
|
The Service Period End Date at the
Effective Date
|
Examples
To properly load, fields in each row of the file must be in the following sequence:
GrantID, TrancheID, EffectiveDate, InstrumentsMultiplier, EPSMarketMultiplier,
EPSPerformanceMultiplier, FairValue, ExercisePrice, ServicePeriodEndDate
|
An example of valid lines in an MPA Schedule File are as follows:
Grant004, 0001,1.5,1.6,1.5,10.5,25.50,10/10/2012
Grant005, 0001,,,1.5,12.5,30,04/01/2012
|